Policy Analysis
Provide a brief overview of the Site C hydroelectric project currently under construction in
British Columbia. Discuss how the project ts into the electricity requirements of British
Columbia (demand side), with consideration given to alternative ways of meeting this demand. In addition, provide some analysis of how the costs of this project (much higher than
originally forecast) compare with British Columbias current costs of generating electricity
and costs of possible alternatives.
Your report should be a maximum of three pages of text. Be sure to provide references and
citations. The report should be double-spaced with 12-pt font and 1 inch margins. Any
gures or tables must be references within your text.
Here is one addition information provided. Site-C is uploaded as a PDF.
https://www.theglobeandmail.com/canada/british-columbia/article-site-c-dam-delayed-costs-jump-to-16-billion/?utm_source=Shared+Article+Sent+to+User&utm_medium=E-mail:+Newsletters+/+E-Blasts+/+etc.&utm_campaign=Shared+Web+Article+Links